×
×
SNOW CONDITIONS »
cm
cm
OVERNIGHT
48 HOURS
cm
cm
24 HOURS
7 DAY
WEATHER »
UPPER MOUNTAIN
° C
° C
HIGH
LOW
LOWER MOUNTAIN
° C
° C
HIGH
LOW
RUNS »
     
/
81
GROOMED
     
/
145
OPEN
LIFT STATUS »
/
10
OPEN
ELK QUAD CHAIR:
TIMBER EXPRESS:
BUY LIFT TICKETS
WEATHER FORECAST »
FRI
HIGH 28 °C
LOW 17 °C
SAT
HIGH 26 °C
LOW 21 °C
SUN
HIGH 24 °C
LOW 19 °C

 ×
MOUNTAIN CAMS »
GRIZ CAM
CEDAR BOWL
LIZARD CAM
WHITE PASS
CHAIR
BEARS DEN
LIZARD RUN
×
CM
in the last 24 hours
×
Notification Alert
1 (800) 258-7669
  
  
BLOG | JOBS | HOURS | CONTACT US
SAFETY & RISK AWARENESS
WEB CAMS
LIZARD RUN
 
 

Fernie Alpine Resort

  • PLAN & PURCHASE
    • Close
    • TICKETS & PASSES
      Day Tickets
      Summer Season Passes
      LESSONS & RENTALS
      Summer Adventure School
      Mountain Biking Lessons & Camps
      Bike Rentals
      Bike Service
      LODGING
      View All Lodging
      Hot Deals & Packages
      Lizard Creek Lodge
      Névé Spa
      MORE
      Getting Here
      Gift Cards
      Weddings
      Groups
      Corporate Groups & Events
      School Groups
      WINTER
      SUMMER
      WINTER
      SUMMER
    • Close
  • THE MOUNTAIN
    • Close
    • MOUNTAIN INFO
      Hours of Operation
      Mountain Stats
      Resort Map
      Trail Report
      Mountain Cams
      HIKING/SIGHTSEEING
      Hiking Trails & Map
      Interpretive Centre
      Sightseeing
      Guided & Specialty Hikes
      BIKE PARK
      Explore the Bike Park
      Bike Trails
      Lessons & Camps
      Rentals
      KIDS
      Kids Summer Camps
      Forest Playground
      THE VILLAGE
      Dining
      Shopping
      WINTER
      SUMMER
      WINTER
      SUMMER
    • Close
  • EVENTS & ACTIVITIES
    • Close
    • EVENTS
      All Events
      Event Results
      ACTIVITIES
      Mountain Biking
      Guided Hiking Tours
      Sightseeing
      Kids Summer Camps
      Interpretive Centre
      Forest Playground
      Other Activities
      DISCOVER
      Press Releases
      Real Estate
      History & Legend of the Griz
      Contact Us
      Work with Us
      Email Sign Up
      WINTER
      SUMMER
      WINTER
      SUMMER
    • Close
  • SHOP NOW

Timber Chair Update

Timber Chair Update

by Emma Padgett / Thursday, 12 September 2019 / Published in Blog, Fernie

Each season Fernie Alpine Resort strives to make improvements and upgrades to our existing services to ensure that you have the best vacation and recreational experience possible.

As a lot of you know, this summer the Timber Chair has been undergoing a significant makeover. The work that is being done is extensive and time-consuming but will add an extra 25 years onto the life of the chair.

In May, a crane and a D8 dozer travelled up the mountain to remove the gearbox out of the Timber Chair top station and transport it down to the maintenance shop. The gearbox was then successfully rebuilt by our maintenance team, in conjunction with an engineer from Austria, and transported back to the top of the lift and re-installed.

The delivery of the 2nd communication line for the electrical upgrade was delayed by three weeks and arrived the second week of July. The comm line is approx 1.8M/ 2.9KM long and weighs 6 Tons; a crane was required to lift the cable off the delivery truck. The cable was loaded to a specially prepared trailer for transport to the Timber unload /top station to be prepared for pulling in. The comm line carries electrical signals through for the safety circuits between the load and unload stations to ensure the safe running of all equipment.

In mid-July, on a cold and rainy day, up to 30 staff, including the electrical crew, pull the cable by hand from the Timber top station to the load at the base. They had to go from tower to tower, up and over every tower top and through the rollers. It was a massive effort by our Mountain Operations team and at the end of the day, rain-soaked and cold, they were all still smiling.

The next step was for the electrical crew to go through the process of setting the tension of the cable between every tower and terminating the electrical connections.

The panels that drive and control that chair lifts start, run and monitor all the safety devices and stop the controls, arrived on August 16th and installation began right away. The panels were installed in a day, but it took three weeks to connect all the wiring between the drive/control panel and the station and to verify that it was working correctly.

During the week of September 23rd, the lift is expected to start turning. We will be testing the setup and ensuring the correct functionality.

The load test is planned for the beginning of October. This involves loading the chairs with weighted buckets and performing a series of safety tests to ensure everything meets the manufacturer and Technical Safety BC standards.

Then, on November 30th (tentative opening date!), the Timber Chair will be waiting for you to take a ride. We can’t wait!

Tagged under: Timber Chair

About Emma Padgett

I spend my days in the mountains creating and sharing my favourite place in the world in the hope that it will inspire others to visit and love Fernie Alpine Resort and the wonderful town of Fernie as much as I do.

Other related posts

Best Family Ski-in/Ski-out Accommodation at Fernie Alpine Resort
Kids Summer Camps at Fernie Alpine Resort | Mountain Bike & Adventure Camps
Announcing the Purchase of Four (4) New Lifts for Resorts of the Canadian Rockies’ BC Resorts

Vacations

PARTNERS
SIGNUP FOR THE LATEST NEWS & RESORT SPECIALS
From Fernie Alpine Resort
SIGN UP

 

CONTACT US
information@skircr.com

5339 Ski Hill Road
Fernie, BC V0B 1M6
Canada
ABOUT RCR

About RCR
Media Inquiries
Job Postings
Donations
Partners
INFORMATION

Contact Us
Help Center
Experience Survey
Hours
Winter Member Benefits
Utility Services
Community Services Assessment (Rent Charge)
Summit Fund
HOW TO ORDER

Online Store
By Phone
Installment Plan
LEGAL

Terms & Conditions
Waivers & Release Agreements
Privacy Policy
RCR is inclusive. Harassment and discrimination of any kind will not be tolerated.
ABOUT FERNIE REAL ESTATE SAFETY PRESS RELEASES JOBS CONTACT US
TOP
Fernie Alpine Resort uses 'cookies' to enhance the usability of its websites and provide you with a more personal experience. By using this website, you agree to our use of cookies as explained in our Privacy Policy. I AGREE
Privacy & Cookies Policy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may have an effect on your browsing experience.
Necessary
Always Enabled
This is an necessary category.
Non Necessary
This is an non-necessary category.
Save & Accept